Pre-surgical and post-surgical alterations of arterial blood pressure circadian rhythmKatinas G.S.,
Astakhov Y.S.,
Sedov S.M.,
Yashin S.M.,
Chibisov S.M.,
Shastun S.A.,
Astakhov S.Y.,
Boldyreva I.B.,
Gromyko A.G.,
Merkuryeva T.B.,
Nefedova D.M.,
Smirnov D.A.,
Mitina E.V. .2005 was performed traditionally (T, medications in mornings and evenings), later
scheduled according
Measures of problem uncertainty for total weighted flow time scheduling on a single machineA single-machine
scheduling problem is investigated under the assumption that the processing time
Introduction to scheduling in industry 4.0 and cloud manufacturing systemsIn this chapter, we present an introduction to
scheduling in Industry 4.0 and cloud manufacturing
Proactive scheduling and reactive real-time control in industry 4.0Scheduling in Industry 4.0 systems belongs to a class of problems that have mixed structural
Outer space demilitarization: International legal aspect of the Treaty on the Prevention of the Placement of Weapons in Outer Space focusing on the concept of
pre-emptive Automated scheduling system for university classesThis article mainly studies the design and implementation of the university slasses
scheduling